FOR CLOSURE OF CONDUITS IN THE EVENT OF “ON-HOLD”

 
 

Sheltered: utilization without sealing.
Weather-exposed: utilization with sealing gasket.

(One recommends the use of Vaseline at the sealing gasket).
 
 
 
CONDUIT CODE
C = ORDINARY
D = DIN 2440
S = SCHEDULE 40
PB = PVC CLASS B
PA = PVC CLASS A
 
SYSTEM
CONDUIT TYPE
INSTALLATION TYPES AND CODE

ORDINARY – PVC / B
NBR 5624 - NBR 6150

Gauges
Box Dimensions
mm
Inches
A
B
Sheltered
Weather-exposed
15
1/2
24,0
21,1
UF 012 (C-PB)
UFT 012 (C-PB)
20
3/4
25,0
26,2
UF 034 (C-PB)
UFT 034 (C-PB)
25
1
27,0
33,2
UF 100 (C-PB)
UFT 100 (C-PB)
32
1 1/4
32,0
42,2
UF 110 (C-PB)
UFT 110 (C-PB)
40
1 1/2
36,0
47,8
UF 112 (C-PB)
UFT 112 (C-PB)
50
2
39,0
59,4
UF 200 (C-PB)
UFT 200 (C-PB)
65
2 1/2
47,0
75,1
UF 212 (C-PB)
UFT 212 (C-PB)
65
2 1/2
-
-
-
-
80
3
55,0
88,0
UF 300 (C-PB)
UFT 300 (C-PB)
100
4
69,0
114,3
UF 400 (C-PB)
UFT 400 (C-PB)
 
     
 
CONDUIT TYPE
INSTALLATION TYPES AND CODE
DIN - SCHEDULE - PVC/A
NBR 5597 - NBR 5598 - NBR 6150
Box Dimensions
A
B
Sheltered
Weather-exposed
24,0
21,3
UF 012 (D-S-PA)
UFT 012 (D-S-PA)
25,0
26,9
UF 034 (D-S-PA)
UFT 034 (D-S-PA)
27,0
33,7
UF 100 (D-S-PA)
UFT 100 (D-S-PA)
32,0
42,4
UF 110 (D-S-PA)
UFT 110 (D-S-PA)
36,0
48,3
UF 112 (D-S-PA)
UFT 112 (D-S-PA)
39,0
60,3
UF 200 (D-S-PA)
UFT 200 (D-S-PA)
47,0
76,1
UF 212 (D-PA)
UFT 212 (D-PA)
47,0
73,0
UF 212 (S)
UFT 212 (S)
55,0
88,9
UF 300 (D-S-PA)
UFT 300 (D-S-PA)
69,0
114,3
UF 400 (D-S-PA)
UFT 400 (D-S-PA)
 

Condulete - Condulete without thread - Aluminum Condulete - Pass Box
Conduit Connections - Without connections to Threaded Conduit - Derivation Boxes
Floor Boxes - Conduit Union - Uniduct - Cables Press - Aluminum Cables Press
Junction Box - Aluminum Junction Box - Electrical connection box